Thornton Tomasetti About UsServicesProjectsNews And AwardsContact
Project 1Project 2Project 3Project 4Project 5Project 6Project 7Project 8Project 9Project 10Project 11Project 12Project 13Project 14Project 15Project 16
Soldier Field, Chicago, Illinois
The adaptive reuse of Chicago's Soldier Field tackled complex geometry and steel construction innovations in one of the NFL's fastest constructed stadiums. The project required fitting a full-size, modern stadium into a 600-foot-wide space within a 20-month schedule. The architectural solution was an asymmetrical design with general admission seats on one side of the stadium and stacked luxury suites atop two cantilevered club decks on the other. That configuration, a first in NFL stadiums, saved enough space to fit a 61,500-seat stadium inside the colonnades.

To accelerate the steel fabrication and erection process, Thornton Tomasetti, in a joint decision with the project team members, adopted Tekla Structures 3D modeling software. Using Tekla Structures, valuable time was saved and costly miscues from design to fabrication and installation were averted.

In honoring Soldier Field as its 2003 Overall Project of the Year, Midwest Construction noted the difficult geometry, the time savings by designing in three dimensions, and the teamwork required to get the project completed. Faced with the challenges of a spectacular design, site restrictions and a compressed construction schedule, the Thornton Tomasetti team responded with innovative engineering and the latest technology.

David B. Seide, Defined Space | About Us | Services | Projects | News & Awards | Contact | Site Map |